Global Manufacturing Partner
Capability Proofdie casting quality documentation

Quality Management & Inspection Practices | KastMfg

How KastMfg documents and controls die casting quality: inspection flow, CMM and spectrometry equipment, material traceability, and automotive-format documentation for die casting programs.

4 min read
Last updated: 2026-11-10

Production Capabilities

Capability proof visuals for die casting quality documentation

Quality Management & Inspection Practices - Quality Documentation & Equipment

Quality Documentation & Equipment

Quality documentation, CMM inspection equipment, tooling capability, and export-ready shipments that demonstrate production credibility.

Quality Management & Inspection Practices - Facility & Process Detail

Facility & Process Detail

Precision measurement setups, warehouse staging, audit documentation, and tooling inspection supporting quality assurance.

This page describes how quality is controlled at our Nanjing facility: the documented processes behind every die casting program, the inspection equipment parts pass through, the paperwork a buyer can request, and how to verify any claim we make. Our quality system is documented and maintained with reference to ISO 9001; automotive programs run on documentation aligned with IATF 16949 practices. Where a program needs third-party documentation, we support the customer's supplier-qualification process with our own process records and supplied material certificates.


The Quality System Behind Every Program

The system covers the full production chain rather than one department:

  • Incoming material control — alloy ingots arrive with supplier certificates of analysis and are verified on our own OES spectrometer before release to production. Heat number and supplier are recorded against the production lot.
  • Process control — die casting parameters (shot profile, die temperature, cycle time) are set per the process sheet and monitored during the run; deviations are recorded and dispositioned, not silently corrected.
  • In-process inspection — first-article inspection at start of run, then statistical dimensional sampling through the lot, with results logged per cavity where the program requires it.
  • Final inspection and release — dimensional and visual screening against the drawing and the control plan; parts ship only after release is signed.
  • Traceability — every lot is tied back to alloy heat, die number, machine and shift, so a question about a shipped batch can be answered from records rather than memory.

A quality manual defines responsibilities and procedures for each step. Process records and inspection results are kept available for customer audit; if a customer's supplier-qualification process requires a documented review, we support it with those records.


Automotive Program Documentation

For automotive programs we work to the documentation set the industry expects, aligned with IATF 16949 practices:

  • APQP — advanced product quality planning on new programs, with the customer's milestones
  • PFMEA — process failure mode and effects analysis maintained and updated with process changes
  • Control plans — critical and significant characteristics documented per drawing
  • MSA / gage R&R — measurement system analysis on critical characteristics before production
  • SPC — statistical process control on designated dimensions during production
  • PPAP — submission packages prepared to the customer's requested level, including dimensional results, material and performance test reports, and process flow documentation

These are programme documents tied to a specific part and customer, not generic paperwork: they are produced for the project, reviewed with the customer, and updated when the process changes.


Inspection and Testing Equipment

Equipment What it verifies
CMM (coordinate measuring machine) Dimensional conformance on critical features, fixture-based per drawing
OES spectrometer Alloy chemistry of every melt, verified against the specified grade
X-ray inspection Internal porosity and voiding on safety- or pressure-critical parts
Leak testing Airtightness on housings, manifolds and fluid-handling castings
Hardness testing Heat-treat and alloy condition verification
Surface and thread gauges Thread, flatness and finish checks per the drawing callout

Equipment is calibrated on a scheduled cycle against traceable reference standards; calibration records are part of the documentation package available to customers.


Material Traceability and Certificates

Material documentation follows the supply chain, not a template:

  • EN 10204 3.1 certificates — mill certificates for the alloy, tied to the heat number used in the lot
  • Certificate of analysis — chemistry verification on our own spectrometer against the specified grade
  • Dimensional inspection reports — measured values against drawing tolerances, with the sampling plan stated
  • Mechanical and performance test reports — tensile, hardness and any program-specific testing, with the test method named
  • IMDS entries — material data sheets submitted for automotive programs where the customer's system requires them

Certificates are tied to the specific lot you receive, not generic copies. If a program needs a document type not on this list, put it in the RFQ — document scope is agreed before the first production run, not argued after.


Material and Environmental Compliance

  • RoHS / REACH — declarations available for the alloys and surface finishes we supply, with the SVHC status stated per declaration
  • Conflict minerals (CMRT) — completed per customer request; the form is a supply-chain declaration, not an audit result
  • Alloy certification — the grade specified on the drawing is verified on every melt by spectrometry, and the result travels with the lot

How to Verify Anything on This Page

We would rather you check than take this page on trust:

  1. Ask for the process documentation for a comparable program — control plan, PFMEA, inspection report format. Real documents show how a shop works; a page like this one is only a summary.
  2. Request the material certificate for a sample lot and compare the heat number with the inspection report's lot reference — the two should match.
  3. Name the standard you work to — if your program requires specific IATF 16949-aligned documentation, say so in the RFQ and the submission package is scoped accordingly.
  4. Audit if you need to — supplier audits are welcome against our process records; arrangements are made at the RFQ stage.

Related Resources

Next steps for die casting quality documentation

Need a Quote for Your Project?

Our engineering team is ready to review your requirements and provide competitive pricing with fast turnaround.

Request a Quote